| Day T-Plus 135: August 25.
The redwood trim along the windows and doors is almost completely on. From the southeast corner. |
![]() |
| Day T-Plus 138: August 28.
The soffit is on around the house. The southeast corner, from the south side. |
![]() |
| More soffit on the south side. | ![]() |
| And on the southeast corner. | ![]() |
| The porch floor is on, and part of the ceiling too. | ![]() |
| A little on the inside now... The drywall and prep for painting is complete. This is the southeast corner of the house, in the living room. | ![]() |
| Still in the living room, looking south onto the porch. | ![]() |
| Out on the porch, looking west into the dining room. | ![]() |
| Looking into the dining room, looking south. That extra plywood will be gone sometime... | ![]() |
| Looking east onto the porch, from the dining room. | ![]() |
| Looking up the stairs. The window is on the west wall. | ![]() |
| Looking down the stairs—the small square windows are on the south side. | ![]() |
| Conrad's office, looking north. This is the northwest corner of the house. | ![]() |
| Looking east into the living room, down the main hallway. The doorway on the right leads into the kitchen. | ![]() |
| Day T-Plus 142: September 1.
The redwood siding is finally going up! This is the north side of the house. |
![]() |
| The northwest corner of the house (Conrad’s office). | ![]() |
| The southwest corner of the house. The tarp is on the second floor to keep rain from getting in until the siding is on up there. | ![]() |
| The south side side of the house, with Margaret, Lahoma and Ozma on deck. Siding is going up on the east side as well. | ![]() |
| The northeast corner of the house, with the AC unit sitting on the front porch until the final grating is done. | ![]() |